This my be my Silly concern, he said the equipment is 460 s why does he have to have a 480/277 Wye secondary? He doesn't reveal needing a neutral, but when he results in it he has to run it. Doesn't make feeling to me.PV arrays typically are floating as this allows you to detect earth leakage from any stage, together with things such as distributio